{"title":"Pull Out Tests - Certifix Ltd","description":"\u003cp data-path-to-node=\"1\"\u003eEnsure the safety and compliance of your project with our comprehensive preliminary and post-installation pull testing services. Adhering strictly to BS8539:2012 standards, we offer rigorous validation for anchors in various substrates. For preliminary phases, we conduct site-specific checks to identify the most cost-effective anchoring solution, validating performance with a series of consistent tests. For active projects, our post-installation proof testing serves as a vital quality gate, verifying the integrity of your fixings before cladding rails and panels are installed.\u003c\/p\u003e\n\u003cp data-path-to-node=\"2\"\u003eWe operate on a transparent daily rate structure to accommodate the unpredictable nature of site conditions and installation variables. This all-inclusive fee covers the expertise of a qualified engineer, the use of specialized equipment and all associated travel costs. Following the site visit, you will receive a detailed, professional report that meets all regulatory requirements, providing you with the documented assurance needed for building control and structural sign-off.\u003c\/p\u003e","products":[{"product_id":"pull-out-test-scotland","title":"Pull Out Test (Scotland)","description":"We offer both preliminary and post-installation tests:\n\nFor preliminary tests, we carry out preliminary checks on a selection of anchors, starting from the most cost effective or as per client’s preference. Once one of these produces a satisfactory result, we will test 5no. of the same anchor to validate a consistent performance into the substrate.\n\nPost-installation proof tests can be carried out to validate the quality of the installation prior to the cladding rails \u0026amp; panels being installed. Our testing is usually chargeable with a daily fee. According to BS8539:2012, testing should occur on 2.5% of anchors, unless there is a failure, if so the percentage increases to 5%. If there is a further failure, 100% of the anchors must be tested. Due to the uncertain nature of the quantity of tests \u0026amp; man hours required for each project, as it depends on the quality of installation which is outside of our control, we offer a daily rate instead of a fixed fee \/ build in cost.","brand":"Certifix","offers":[{"title":"Default Title","offer_id":51279169257636,"sku":"26253","price":1100.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0657\/4496\/1700\/files\/pull_test2.jpg?v=1773977715"},{"product_id":"pull-out-test-london","title":"Pull Out Test (London)","description":"We offer both preliminary and post-installation tests:\n\nFor preliminary tests, we carry out preliminary checks on a selection of anchors, starting from the most cost effective or as per client’s preference. Once one of these produces a satisfactory result, we will test 5no. of the same anchor to validate a consistent performance into the substrate.\n\nPost-installation proof tests can be carried out to validate the quality of the installation prior to the cladding rails \u0026amp; panels being installed. Our testing is usually chargeable with a daily fee. According to BS8539:2012, testing should occur on 2.5% of anchors, unless there is a failure, if so the percentage increases to 5%. If there is a further failure, 100% of the anchors must be tested. Due to the uncertain nature of the quantity of tests \u0026amp; man hours required for each project, as it depends on the quality of installation which is outside of our control, we offer a daily rate instead of a fixed fee \/ build in cost.","brand":"Certifix","offers":[{"title":"Default Title","offer_id":51279169421476,"sku":"26252","price":850.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0657\/4496\/1700\/files\/pull_test2.jpg?v=1773977715"},{"product_id":"pull-out-test-england-wales","title":"Pull Out Test (England \u0026 Wales)","description":"We offer both preliminary and post-installation tests:\n\nFor preliminary tests, we carry out preliminary checks on a selection of anchors, starting from the most cost effective or as per client’s preference. Once one of these produces a satisfactory result, we will test 5no. of the same anchor to validate a consistent performance into the substrate.\n\nPost-installation proof tests can be carried out to validate the quality of the installation prior to the cladding rails \u0026amp; panels being installed. Our testing is usually chargeable with a daily fee. According to BS8539:2012, testing should occur on 2.5% of anchors, unless there is a failure, if so the percentage increases to 5%. If there is a further failure, 100% of the anchors must be tested. Due to the uncertain nature of the quantity of tests \u0026amp; man hours required for each project, as it depends on the quality of installation which is outside of our control, we offer a daily rate instead of a fixed fee \/ build in cost.","brand":"Certifix","offers":[{"title":"Default Title","offer_id":51279169487012,"sku":"26251","price":750.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0657\/4496\/1700\/files\/pull_test2.jpg?v=1773977715"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0657\/4496\/1700\/collections\/pull_out_tests.jpg?v=1778579447","url":"https:\/\/certifix.co.uk\/collections\/pull-out-tests.oembed","provider":"Certifix","version":"1.0","type":"link"}